ARROWHEAD PARK MASTER PLAN
Conceptual Master Plan for Arrowhead Park, Neenah, WI (Image credit: SEH Inc.)
PROJECT OVERVIEW
While working for SEH Inc. Andrew Dane led preparation of a conceptual Master Plan for the City of Neenahy. He served as project manager and lead planner for the preparation of a 30-acre master plan for Arrowhead Park, located on Little Lake Butte Des Morts adjacent downtown Neenah, WI. The study identified a network of new pedestrian and multi-use trails; waterfront improvements; boating and fishing access points; and wildlife viewing areas. A centrally located civic building is proposed at the terminus of a new access road into the park. The study was unique in that it also identified several redevelopment opportunities adjacent the park, with the goal of establishing a mixed use neighborhood along the perimeter of tbe park over time.
KEY RECOMMENDATIONS
Trails, fishing, and boating access
Community visioning and strategic planning
Cost estimates and grant applications
Redevelopment opportunities
RESULTS
Trails, park drive, wayfinding signage
New residential development on Main Street at park entrance
Appleton Downtown and Comprehensive Plan Arrowhead Park Master Plan Creative Placemaking Downtown Waupaca Downtown Marshfield Master Plan Economic Development Studies
Fox Cities Trail Mapping
La Crosse Downtown Plan Moonwater Cafe South Riverfront Master Plan
South Commercial St Corridor Plan The 602 Club Towers Area Market Study
Water Street Corridor Plan